Fire Station 1

Milestone timeline:

Space Needs Study and Building Assessment Conducted
Completed: Dec 5, 2019
2019
Study and Options for Fire Station 1 and 3 Presented to Council
Completed: Jan 9, 2020
Winter 2020
Bidding
Completed: Jan 29, 2021
January 2021
Architect Selected
Completed: Apr 1, 2021
Spring 2021
Construction Manager Selected
Completed: Jun 3, 2021
Summer 2021
Update to Council
Completed: Aug 25, 2021
Summer 2021
Update to Council
Completed: Feb 10, 2022
February 2022
Design Finalization, Permitting, Bidding
Completed: Jun 30, 2022
Spring 2022
Construction Start
Completed: Jan 25, 2023
January 2023
Estimated Completion
Completed: Aug 9, 2024
June/July 2024
Grand Opening Ceremony
September 20, 2024

Following a space study and building assessment, it was determined Fire Station 1 was no longer adequate for the growing Hendersonville Fire Department. The findings were presented to City Council in early 2020 that found numerous space and safety concerns. Following demolition of the existing 9,854 square-foot building constructed in 2000, a new, 19,750 square-foot station will be constructed. The station will include a one-story portion to house three companies and their Battalion Chiefs and corresponding living quarters, kitchen, restroom and shower facilities. Apparatus bays with attached turnout gear storage and decon areas will allow access to both Main Street and Church Street. A two-story portion of the building will house the administrative offices, life safety division, and training room for the Fire Department.

fire station doors with a gold ribon across with text about the grand opening

The Hendersonville City Council and Hendersonville Fire Department invite the community to join them at the grand opening of Fire Station 1 on Friday, September 20, 2024! The opening ceremony will take place at the newly constructed fire station at 851 North Main Street at 1:00 PM. A celebration and opportunity to tour the fire station will continue until 3:00 PM. 

As part of the event, a fire hose uncoupling will occur in the bays followed by a push-in ceremony where the new engine and tower apparatuses will be ceremonially pushed into the station in traditional fire service tradition.  

The entire community is invited to attend and celebrate. Parking for the ceremony is available on the street as well as in the St. James Episcopal Church (766 N. Main Street) and Bruce Drysdale Elementary School (271 Bearcat Boulevard) parking lots. Onsite parking will be reserved for attendees with mobility challenges and dignitary parking accessible via the lower lot entrance on N. Main Street. 

  • What: Hendersonville Fire Station 1 Grand Opening Ceremony and Open House 
  • Where: 851 North Main Street, Hendersonville, NC 
    Please enter the station from the bays on N. Main Street 
    ADA/Elevator access also available at the main entrance on the north side 
  • When: Friday, September 20, 2024  
    Opening Ceremony 1:00 PM  
    Open House 1:30 PM – 3:00 PM 

Fire Station 1 replaces the previous station that was no longer adequate for the growing Hendersonville Fire Department. The station houses three companies and their Battalion Chiefs, corresponding living quarters, restrooms and shower facilities in addition to administrative offices, life safety division offices and a Fire Department training room. 

Designed by ADW Architects and constructed by Edifice General Contractors, construction of the 19,745 square foot station began in January 2023. The building is equipped with three full-length/pull-through apparatus bays and one half-bay to accommodate one ladder truck, two fire engines, and a quick response vehicle. Features also include photovoltaic (PV) solar panels, rainwater harvesting & irrigation system, permeable pavers, and stormwater improvements.   

The Hendersonville Fire Department appreciates the collaboration of the following partners: 

  • Henderson County Emergency Services for housing an engine company during construction 
  • Valley Hill Fire & Rescue for housing a peak-hour truck during construction 
  • Dana Fire & Rescue for assisting with housing spare apparatus 
  • Carolina Village for offering office space during construction 
  • Hendersonville City Council past and present for their vision and support of Hendersonville firefighters 
  • St. James Episcopal Church and Bruce Drysdale Elementary for providing additional parking areas for ceremony attendees 

 

 

Architect

ADW Architects

Construction Manager At Risk

Edifice General Contractors

red bay doors at a fire station
plan for station 1
fires station rendering
fire station rendering
fire station rendering
fire station rendering
Project Updates: 
Fire Station 1 Grand Opening
Monday, August 5, 2024

The Hendersonville City Council and Hendersonville Fire Department invite the community to join them at the grand opening of Fire Station 1 on Friday, September 20, 2024! The opening ceremony will take place at the newly constructed fire station at 851 North Main Street at 1:00 PM. A celebration and opportunity to tour the fire station will continue until 3:00 PM.